ALTERNATE METHOD OF COMPLIANCE
Applicants Tracking No.:
AMC_005_BCK 1
Type of AMC:
Engineering Judgement
L & C approval required:
No
Local authority approval required:
No
Description of Proposal:
The ICU and Emergency Service Pavilion is a new 140-bed acute care hospital building (OSHPD-1). The project includes limited alterations within existing buildings and associated site and utility modifications. The new buildings are the ICU Pavilion (BLD-06800), an entry canopy (BLD-06803), and an ambulance canopy (BLD-06804).
Reason:
(BCK 1)_Slab Edge Fire Safing Engineering Judgment - 2 Hour Rated Floor Assembly.
The purpose of the attached letter is to evaluate and determine that the
fire-resistive integrity required by code will be provided by the
proposed EJ NS17422024. The basis of our evaluation is an
engineering judgment and a comparison between the EJ NS17422024
and similar system conditions listed in the UL listed assemblies,
specifically system Nos. CW-D-1041 and CW-D-2004.
Scope of Change:
See "Description of Proposal" above
Code Year:
2019 California Building Standards Code
Building Standards Code:
California Building Code (CBC)
Code Section:
(Chapter 24 - Glass and Glazing) inclusive of section 2410 "(DSA-SS, DSA-SS/CC, OSHPD 1, 1R,2,4 & 5) Structural Sealant Glazing (SSG)"
SECURITY
Facility PIN Code:
********
PAYMENT OPTION
Payment Option:
Invoice Me